Check out our latest bathroom rip-out, design and renovation.
We started by ripping out the clients old and dated bathroom and then went to work on designing the bathroom, following the instructions of our clients.
We supplied all materials and then plastered, tiled, laid out and installed.
Here’s a snapshot of what we completed:
- FULL RIP-OUT OF EXISTING BATHROOM
- BATHROOM DESIGN
- TILED
- PLASTERED
- INSTALLED NEW SHOWER
- INSTALLED NEW BATH
- INSTALLED TOILET AND BASIN
- LAID NEW FLOOR
Check out our gallery below to see step by step, how ADKB completed this bathroom transformation. Don’ forget – see something you love? Call us on: 0121 270 2895 TODAY!